Elleber Temporary Bridge Project

MCB provided full project execution support under a USDA Forest Service contract for the installation of a temporary bridge in the Monongahela National Forest. We stepped directly into the key personnel roles of Project Manager, Quality Control Manager, Safety Manager, Environmental Manager, and Scheduler.


Work included site preparation, abutment and approach construction, crane operations, structural steel placement, and timber decking installation in a remote forest environment. All activities were executed under continuous safety oversight while protecting the stream channel and surrounding environment.


Despite the short two-day period of performance, MCB maintained strict control of quality, safety, schedule, and contract modifications from start to finish — delivering the project on time and within the adjusted contract value.

This is a clear example of the Won and Run model: real construction professionals who write the technical volumes and then step into the field roles to execute the work.

Back to Projects
Rock and dirt construction near a muddy pond.

Site preparation and rock placement for the temporary bridge abutments and approach. Work performed under continuous safety oversight while protecting the stream channel and surrounding environment.

Two men stand beside a muddy creek under construction.

Project team reviewing site conditions and temporary bridge layout prior to installation. Coordination ensured compliance with safety and environmental requirements while maintaining the project schedule.

Two men working on a large crane in a forested area.

Crane mobilization and setup for temporary bridge installation. All lifting operations conducted under continuous safety protocols in the remote forest environment.

Five men working with heavy equipment in a forest.

Crew and inspectors reviewing abutment and approach preparation prior to setting bridge components. Work sequenced to maintain quality control and schedule compliance.

Workers guiding a large metal structure being lifted by a crane in a wooded area.

Crane lifting structural steel components for the temporary bridge installation. All elevated and heavy-lift operations performed under continuous safety oversight.

Man walking on a newly constructed wooden bridge.

Crew installing timber decking on the temporary bridge structure. Work completed in accordance with project specifications and safety requirements.

Show More

Copyright © 2026 Midcon Builds LLC - All Rights Reserved.

  • Home
  • Services
  • Projects
  • International
  • About
  • Contact
  • Resume and Certs

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept