This project was executed under Midcon Builds’ Won and Run model for the United States Air Force on Tyndall Air Force Base Project XLWU 19-8402. Midcon Builds identified the opportunity, developed the winning proposal, supported project estimating, and took on key project leadership roles including Project Manager, Design Project Manager, Environmental Manager, Quality Control Manager, Safety Coordinator, and Specifier for the Prime Contractor.
The primary goal of this Design-Build project was to construct a new ADC facility (B1287) to replace a structure demolished after extensive damage from Hurricane Michael. The work included design and construction of a new 1,600-square-foot CMU building with CMU veneer, complete mechanical, electrical, and plumbing systems, architectural finishes, and all supporting infrastructure required for a fully operational facility.
The project was designed and built to Department of Defense building standards and the Florida Building Code, including High Velocity Hurricane Zone (HVHZ) requirements. Delivery required coordination of design development, engineering, permitting, procurement, quality control, safety management, environmental compliance, construction execution, and project closeout to produce a resilient, hurricane-resistant facility capable of supporting long-term Air Force operations.
The project was completed safely, on schedule, and within budget.

Foundation preparation and vapor barrier installation for the new CMU structure at Tyndall Air Force Base.

Night concrete placement for the building slab under continuous quality control and safety oversight.

Site work and temporary facilities during early construction of the hurricane-resistant ADC facility.

Crew setting forms and reinforcing steel for the foundation and slab on grade.

Completed concrete slab with embedded anchors and utilities ready for CMU wall construction.

CMU mock-up or sample wall section constructed to verify materials and workmanship standards.