Relocate Generator Facility - Design-Build

This project was executed under Midcon Builds' 'Won and Run' model for the United States Air Force. Midcon Builds identified the opportunity, developed the winning proposal, supported project estimating, and took on essential project leadership roles such as Project Manager, Design Project Manager, Environmental Manager, Quality Control Manager, Safety Coordinator, and Specifier for the Prime Contractor.


The objective of the Tyndall Air Force Base Project XLWU 21-8107, which involved the design-build construction to relocate the generator facility (B42), was to move an existing emergency generator to meet future mission needs. This design-build project encompassed the design and construction of a new 192-square-foot pre-engineered metal building (PEMB) to house the relocated generator, alongside all necessary mechanical, electrical, architectural, and site improvements to ensure a complete and operational facility.


The project adhered to the Department of Defense building standards and the Florida Building Code, incorporating the High Velocity Hurricane Zone (HVHZ) requirements. Additional work involved approximately 2,500 linear feet of horizontal directional boring near the Tyndall AFB runway within the active flight line environment, as well as the installation of associated utility infrastructure and the demolition and abandonment of the existing generator facility.


Extensive coordination was required for design development, permitting, horizontal utility construction, runway and flight line access, quality control, safety management, environmental compliance, procurement, construction execution, and project closeout activities to effectively support Air Force mission requirements.


Overall, the project was completed safely, on schedule, and within budget.

Back to Projects

Generator Facility Design-Build at Tyndall Air Force Base

Warning sign indicating a controlled area with restricted access.

Controlled area warning sign at the Tyndall AFB generator facility relocation site.

Man working with shovel on dry grass near green electrical boxes.

Survey and layout operations for the new pre-engineered metal building foundation.

Electrical utility box with warning signs in a grassy area.

New Transformer installed to support the relocated generator facility.

Flatbed trailer loaded with materials near a pickup truck in an open field.

Generator and support equipment staged during the relocation process.

Construction worker working on a small shed under a cloudy sky.

New pre-engineered metal building under construction to house the relocated generator.

Metal shed on a dirt ground under a cloudy sky.

Completed exterior of the new generator facility building.

Show More

Copyright © 2027 Midcon Builds LLC - All Rights Reserved.

  • Home
  • Services
  • Projects
  • About
  • Contact
  • Resume and Certs

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept