This road rehabilitation project was performed under Midcon Builds' "Won and Run" model for the USDA Forest Service. Midcon Builds identified the opportunity, developed the winning proposal, supported project estimating, and then served in key leadership roles including Project Manager, Safety Coordinator, Quality Control Manager, Environmental Manager, Scheduler, and Specifier for the Prime Contractor.
Funded through the Emergency Relief for Federally Owned Roads (ERFO) Program, the project involved the rehabilitation of Forest Road 719A Extension and an unnamed woods road, as well as the decommissioning of approximately 1.91 miles of Sulphur Lick Run Road within the Monongahela National Forest. The work addressed roadway damage caused by severe storm events and included reconstruction of washed-out roadway sections, slope stabilization, clearing and grubbing, embankment construction, mechanically stabilized earth (MSE) walls, culvert replacements, roadway resurfacing, stream crossing improvements, and associated site restoration activities.
The project required detailed coordination of earthwork, drainage improvements, erosion and sediment control measures, roadway reconstruction, and environmental compliance activities within an active National Forest environment. Midcon Builds effectively managed project planning, scheduling, quality control, safety compliance, environmental controls, and overall project execution throughout construction.
The project was completed safely, on schedule, and within budget.

Existing roadway and drainage conditions along Sulfur Lick Run prior to rehabilitation. Project addressed storm damage and required full compliance with USFS and environmental requirements.

Failed drainage pipe and eroded embankment conditions documented prior to reconstruction. Work scoped to restore roadway integrity while protecting the stream environment.

Site conditions showing eroded slopes and damaged drainage features prior to earthwork and roadway reconstruction.

NPDES stormwater permit notification sign for the Sulfur Lick Run rehabilitation project. All work performed under continuous environmental compliance and safety oversight.

Survey control and layout for roadway realignment and drainage improvements. Work sequenced to maintain dimensional accuracy and schedule compliance.

Existing embankment and roadway conditions prior to reconstruction. Temporary access maintained while protecting adjacent forest resources.