This project was a Won and Run, where we wrote the proposal and took on key leadership roles such as Project Manager, Safety Coordinator, Quality Control Manager, Environmental Manager, Scheduler, and Specifier for the Prime Contractor. This endeavor fell under the NAVFAC Southeast Gulf Coast Area of Responsibility Design-Build / Design-Bid-Build Multiple Award Construction Contract (N6945024D0020), showcasing our expertise in building demolition services.
MidCon Builds also played a pivotal role by supporting the original MATOC proposal. The Prime Contractor, NNAC, was awarded this task order for the design and demolition of the covered walkway at Building S237, Naval Support Activity Mid-South, Millington, Tennessee.
The existing concrete canopy structure exhibited significant deterioration, including cracking, spalling, and exposed rebar at the building connection points. The scope of this NAVFAC Southeast demolition included conducting a detailed existing-conditions assessment, installing temporary adjustable steel shoring to safely support the slab during work, controlled demolition of the walkway, debris removal, repairing the building face where the structure was attached, placing new concrete sidewalks, and complete site restoration with sod.
Work was performed in an active installation environment and was completed successfully, on schedule, and within budget.

Site preparation for covered walkway demolition at Building S237, NSA Mid-South. Temporary traffic control and delineation installed to maintain safe pedestrian and vehicular access during work on the active installation.

Post demolition, finished edge, showing the canopy connection to the building face. Conditions assessment confirmed significant deterioration requiring controlled removal under NAVFAC safety protocols.

Covered walkway interior view prior to demolition. Temporary adjustable steel shoring was installed to safely support the building face during canopy removal while protecting personnel and maintaining operational continuity.

Personnel conducting final review of the covered walkway prior to demolition. Work sequenced to ensure continuous safety oversight and compliance with EM 385-1-1 and the approved project schedule.

Close-up of deteriorated concrete canopy edge showing cracking, spalling, and exposed rebar at the building connection points. Conditions confirmed the need for controlled demolition and subsequent building face repairs.

Active demolition area with heavy equipment staged and orange safety fencing in place. All work performed within established exclusion zones while maintaining safe access for installation personnel.