This project was a Won and Run (Midcon Builds wrote the proposal, estimated the project, and then performed as Project Manager, Design Project Manager, Environmental Control, Quality Control Manager, Safety Coordinator, and Specifier for the Prime Contractor) for the US Air Force.
The purpose of the Tyndall Air Force Base (TAFB) project XLWU 19-8402, Construct New ADC Facility (B1287), is to replace a building that was demolished due to damages sustained in Hurricane Michael. The work provides a complete facility in full compliance with current building codes, including the DoD Building Code, and the portion of the Florida Building Code that contains the High Velocity Hurricane Zone (HVHZ) provisions. It is a Design-Build New Construction project for a 1600 SF CMU/CMU Veneer building, including Building, MEPs, and Finishes.
Work is ongoing.